Whiteman Air Force Base Site Inspection Sampling

KIAN successfully completed a Comprehensive Site Evaluation (CSE), Phase II, at the former small arms range located at Whiteman Air Force Base. Constructed in 1942 and operational until 1990, this evaluation was part of the Military Munition Response Program (MMRP) to assess potential environmental impacts from historical military activities.

The methodology of the CSE Phase II built upon findings from the initial Phase I report, which highlighted the potential presence of munitions constituents (MC) at levels which endorsed further investigation. KIAN reviewed historical data and conducted site reconnaissance to develop an updated Conceptual Site Model (CSM), guiding the Phase II investigation.

KIAN’s specialized team undertook a range of activities including the development of the Project Management Plan (PMP), Quality Assurance Project Plan (QASP), and Uniform Federal Policy for Quality Assurance Project Plans (UFP-QAPP). Field sampling procedures were meticulously designed to align with client expectations and regulatory guidelines, ensuring compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA).

Field activities encompassed X-ray fluorescence (XRF) screening, surface soil sampling, surface water and sediment sampling, and comprehensive site surveys. The investigation aimed to characterize environmental conditions and identify potentially affected media, with the ultimate goal of securing approval from the U.S. Army Corps of Engineers (USACE), the U.S. Air Force (USAF), and other regulatory bodies.

With the completion of this CSE Phase II, KIAN has laid the groundwork for informed decision-making regarding the site’s future, contributing to the ongoing commitment to environmental safety and compliance at Whiteman Air Force Base.

Related Projects

Weingarten POW

KIAN has been contracted by the USACE, Omaha District to conduct a site investigation (SI) at the Former Weingarten Prisoner of War (POW) Camp, specifically focusing on the historical use of two small arms firing ranges. This investigation includes surface soil sampling, near-surface soil sampling, surface water, sediment, and background sampling to assess the potential presence or absence of munitions constituents (MC) associated with past military training activities.

Lonestar

Work included design-building:
Planning documents (APP, ESS, Work Plan, design drawings), One-Call, MEC/UXO clearance, blast resistant building, electrical, plumbing, HVAC, site work, ADA ramp, ADA parking and sidewalk, EV charging station, sanitary sewer, septic tank inspection and cleaning, tree removal, grading, parking, mechanical gate with solar panels, repair and replace deteriorated waterline, etc. The project also includes 24 months of maintenance and janitorial support of all facilities.