Modernization of 3 elevators: Installed new HydroAccel controller, power unit, motor, starter, dry PU. Remove existing and install new hoistway doors, car doors, operators, and tracks. Remove and install new load-weighing devices, switches, cables, codes, buttons, panels, and audible signals. Install wiring for the ductless system, furnish it, and install a split system unit.

Related Projects

Weingarten POW

KIAN has been contracted by the USACE, Omaha District to conduct a site investigation (SI) at the Former Weingarten Prisoner of War (POW) Camp, specifically focusing on the historical use of two small arms firing ranges. This investigation includes surface soil sampling, near-surface soil sampling, surface water, sediment, and background sampling to assess the potential presence or absence of munitions constituents (MC) associated with past military training activities.

Whiteman Air Force Base Site Inspection Sampling

KIAN successfully completed a Comprehensive Site Evaluation (CSE), Phase II, at the former small arms range located at Whiteman Air Force Base. Constructed in 1942 and operational until 1990, this evaluation was part of the Military Munition Response Program (MMRP) to assess potential environmental impacts from historical military activities.