Emergency Cottage Bridge Repair

Work included design-building: investigation of a storm-damaged bridge to the cottage, replacing wood, replacing and repairing structural steel, replacing the ADA ramp, disconnecting the existing waterline from the bridge, providing a boardwalk to the cottage, site restoration, etc.
Compliant Ramp to Cottage Bridge

Related Projects

Weingarten POW

KIAN has been contracted by the USACE, Omaha District to conduct a site investigation (SI) at the Former Weingarten Prisoner of War (POW) Camp, specifically focusing on the historical use of two small arms firing ranges. This investigation includes surface soil sampling, near-surface soil sampling, surface water, sediment, and background sampling to assess the potential presence or absence of munitions constituents (MC) associated with past military training activities.

Whiteman Air Force Base Site Inspection Sampling

KIAN successfully completed a Comprehensive Site Evaluation (CSE), Phase II, at the former small arms range located at Whiteman Air Force Base. Constructed in 1942 and operational until 1990, this evaluation was part of the Military Munition Response Program (MMRP) to assess potential environmental impacts from historical military activities.