Building Pavilion and ADA Upgrades

Work included design-building: Demolition of existing sidewalks, install heated ADA-compliant sidewalks, construction of a 24×65 cedar pavilion with ADA-compliant concrete slab and B-Building entrance, walk-in cooler, outdoor sink and cooking equipment, lighting, electrical, plumbing, ceiling fans, custom stone signage, helipad walkway, etc.

Related Projects

Weingarten POW

KIAN has been contracted by the USACE, Omaha District to conduct a site investigation (SI) at the Former Weingarten Prisoner of War (POW) Camp, specifically focusing on the historical use of two small arms firing ranges. This investigation includes surface soil sampling, near-surface soil sampling, surface water, sediment, and background sampling to assess the potential presence or absence of munitions constituents (MC) associated with past military training activities.

Whiteman Air Force Base Site Inspection Sampling

KIAN successfully completed a Comprehensive Site Evaluation (CSE), Phase II, at the former small arms range located at Whiteman Air Force Base. Constructed in 1942 and operational until 1990, this evaluation was part of the Military Munition Response Program (MMRP) to assess potential environmental impacts from historical military activities.